Preparing a residential Title 24 report is usually straightforward when the project plans contain the right information. The energy consultant uses the drawings and specifications to understand the building geometry, insulation, windows, HVAC system, water heating, and other energy-related features.

For projects subject to California’s 2025 Energy Code, the CF1R is used to demonstrate that the proposed design and equipment comply with the Energy Code at the permit stage.

Residential architectural plan title 24

Start With the Basic Project Information

Before reviewing the drawings, the consultant first needs to understand where the project is located and what work is being proposed. This helps determine the climate zone, applicable code requirements, and the correct compliance approach.

Project Information Table
INFORMATION WHAT TO PROVIDE WHY IT MATTERS TYPICAL SOURCE
PROJECT ADDRESS Full property address and ZIP code Helps identify location and climate conditions Cover sheet
PROJECT TYPE New home, ADU, addition, remodel, or alteration Determines the appropriate compliance path Scope of work
CONDITIONED FLOOR AREA Existing and proposed square footage Used in energy calculations Floor plans
PERMIT TIMING Expected permit-submittal date Helps identify the applicable code cycle Project schedule

A clear description of the project is especially important for additions and alterations because California provides different CF1R forms depending on the type and size of the work.

Floor Plans and Building Orientation

The floor plan is usually the most important drawing in the plan set. It establishes the size and shape of the conditioned space and shows where the exterior walls, windows, doors, and rooms are located.

Plan Information Table
PLAN INFORMATION WHAT THE CONSULTANT USES COMMON ISSUE HELPFUL DETAIL
WALL DIMENSIONS Building geometry Missing dimensions Clearly dimension exterior walls
ROOM LAYOUT Conditioned vs. unconditioned areas Garage or attic not identified Label all spaces
NORTH ARROW Building orientation Orientation missing Show north on site or floor plan
EXISTING VS. PROPOSED WORK Scope of analysis New work unclear Use clear existing/new notation
Residential floor plan images title 24

Elevations, Sections, and Insulation

Floor plans alone usually do not provide enough information to understand the complete building envelope. Elevations and sections help identify wall heights, roof configuration, ceilings, floors, attics, and insulation locations.

Drawing Information Table
DRAWING IMPORTANT INFORMATION WHY IT IS NEEDED TYPICAL EXAMPLE
EXTERIOR ELEVATIONS Windows, doors, wall heights Confirms exterior surface geometry Front and rear elevations
BUILDING SECTIONS Roof, ceiling, walls, and floors Shows construction assemblies Typical cross-section
CONSTRUCTION DETAILS Framing and insulation location Clarifies thermal boundaries Wall or roof detail
INSULATION SCHEDULE R-values and insulation type Defines envelope performance R-21 wall, R-38 ceiling

Insulation and envelope construction are central to residential compliance, and the 2025 standards include specific requirements for walls, roofs, floors, and fenestration.

Residential plan2 title 24

Window and Door Information

Windows can have a significant effect on energy calculations, so accurate sizes and performance values are helpful.

Window Details Table
WINDOW DETAIL WHAT IT MEANS WHERE TO FIND IT IF NOT YET SELECTED
WIDTH AND HEIGHT Determines glazing area Window schedule Use planned dimensions
U-FACTOR Measures heat transfer Manufacturer data Consultant may use a proposed value
SHGC Measures solar heat gain Manufacturer data Preliminary value may be used
FRAME/TYPE Identify window construction Schedule or specification Update before finalization

Under the 2025 Energy Code, windows and glazed doors are subject to applicable U-factor and solar heat-gain requirements.

HVAC, Ducts, and Water Heating

Mechanical systems are another major part of the Title 24 calculation. If equipment has already been selected, providing the specifications can reduce assumptions and later revisions.

System Information Table
SYSTEM USEFUL INFORMATION TYPICAL SOURCE WHY IT MATTERS
HEATING AND COOLING Equipment type and efficiency Mechanical schedule Affects modeled energy use
DUCT SYSTEM Location and insulation Mechanical plans May affect compliance and verification
VENTILATION Fan type and airflow Mechanical notes Required for indoor-air compliance
WATER HEATER Type, fuel, and efficiency Plumbing plans Affects water-heating performance

Some project measures can also trigger Energy Code Compliance verification, in which case the CF1R must identify those requirements, and the applicable documents must be completed through an approved ECC provider.

What If Some Information Is Missing?

A plan set does not always need to be 100 percent complete before it is sent for an initial Title 24 review. If a window model, HVAC unit, or water heater has not yet been selected, reasonable proposed values may sometimes be used during the draft stage.

The important point is that the final report should match the project that will actually be permitted and built. If major equipment or construction details change later, the energy calculations may need to be updated.

A Simple Submission Usually Works Best

For most residential projects, a good submission consists of the architectural plan set, project address, scope of work, window information, insulation details, and proposed HVAC and water-heating systems.

Sending these items together helps the consultant complete the CF1R more efficiently and reduces back-and-forth questions.

Ready to Submit Your Project?

Send us your available plans and a brief description of the proposed work. If something important is missing for a residential Title 24 report, we will let you know what additional information is needed before completing the report.

Scroll to Top